Standard Description
Equipped with the zero leak bidirectional checking sole-noid valves, this energy unit is built for that operation of two independent circuits. Which are respectively for your main and subordinate platforms of the double scissors lift. Two cut-off valves are made use of for reducing the machine manually in case of energy reduction. If much more independent circuits are demanded for the application please get in touch with us for availability.
Remark: 1. Please seek the advice of our revenue engineer for the different pump displacement, motor electrical power or tank capability.
2. CSA or UL licensed motors can be found upon request.
Exclusive Notes
1. The AC motor is of S3 duty cycle, which could only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean all the hydraulic components concerned before installation of the power unit.
three. Viscosity in the oil shoud be 15~46 cst,along with the oil really should be clean and absolutely free of impurities,N46 hydraulic oil is proposed.
4. The power unit need to be mounted vertically.
five. Check the oil degree within the tank just after the first working in the energy unit.
six. Oil changing is needed right after the preliminary one hundred operation hours,afterwards when every 3000 hours.