Our merchandise are applied in a lot of fields. The item nicely displays environmental protection and energy saving. We examine each piece of bearing by ourselves before supply. Merchandise introduction
5503 EPT EPT to Woman EPT forty five Elbow Stainless Steel JCEPs/EPT Adapter
EPTnical Assist
QC EPTs engineering has the capacity to design drawings conform to SAE, BS, JIS, DIN amp ISO specs. And we can also make according to customers’ drawings or samples.
Associated EPT
EPT Examination Certificate(EN15714/three.one)
We can give the MTR for every shipment.
Production Procedure
Deal and EPT
Our Certificate
QC EPTs has been granted ISO 9001:2015 amp SGS certificates for processing stainless metal EPT hose fittings and adapters.
Why Select Us?
1. History:
QC EPTs is an ISO 9001:2015 licensed manufacturer with above twenty year’s manufacturing knowledge, EPTTizing in EPT hose fittings and adapters. We only emphasis stainless steel material, no carbon steel or brass.
2. Solution assortment, dependable quality:
one. EPT EPT JCEPs
1). forty three Series CrEPTT EPT JCEPs/Couplings
two). HY Collection CrEPTT EPT JCEPs/Couplings
three). BW Sequence CrEPTT EPT JCEPs/Couplings
four). Stainless Metal EPT Ferrule For SAE 100R 1AT, 2AT EPT
five). Stainless Metal Woman JIC seventy four Degree Flare EPT JCEP
6). Stainless Metal Feminine BSP sixty Diploma Cone EPT JCEP
seven). Stainless Steel BSP EPT 60 Degree Cone Seat EPT JCEP
eight). Stainless Metal Woman BSP 60 Degree Cone 90 Elbow EPT JCEP
9). Stainless Steel NPT EPT EPT JCEP
two. EPT Adaptors
1). NPT EPT Thread Adapters
2). O-ring Manager SAE/ORB Adapters
three). JIC 37 Diploma Flare Adapters
4). NPEPT EPT Thread (woman swivel) Adapters
5). O-ring Experience Seal (ORFS) Adapters
six). BSPP/BSPT Adapters
three. Stainless DIN Metric EPT JCEPs
four. Stainless reusable hose fittings
five. Low stress stainless metal press on hose finishes and hose barbs
three. EPTT EPTT Of Raw EPT:
1. We only pick the optimum quality stainless metal uncooked content. And steel suppliers provide substance take a look at certificates for every shipment.
two. We 100% evaluate the measurements of bar inventory and forging blanks by callipers for each and every cargo.
3. We use the Portable XRF Analyser to examination the essential chemical elements of bar stock and forging blanks with 10% for every single cargo(Essential chemical elements incEPTT Cr, Ni, Mo, these chemical elements are very EPTTant for the corrosion efficiency)
4. Besides, we randomly decide up a number of of reducing parts to do even more chemical analysis by spectrograph every single ten daEPTTto make sure the raw material 100% qualified.
4. EPTT EPTT Of Production Process:
one. We are utilizing Sigma EPT-EPT CNC Lathe EPTTs to manufacture stainless steel hose fittings and adapters.
The features of CNC Lathe EPTTs:
1). Dual-aXiHu (West EPT) Dis.s, EPT technique
two). Thread cutting resources: EPT Japan, vargus amp carmex Israel(Have a very steady efficiency during machining)
two. We use callipers to measure the fundamental sizes. And we use the thread gages to inspect the threads.
three. We use Contracer amp Contour Measuring EPTTs to examine the extremely modest angles and diameters.
five. Inspection:
1. First Write-up Inspection In the course of Procedure
one).The operator make the very first post in accordance to production drawings.
2). The operator will inspect the initial report and file. If the sizes and threads meet the producing drawings, and then the first post will be put in a EPTT box( the box is for very first report only).
three). Workshop foreman will get next inspection for the first report.
4). Only passing the inspection by workshop foreman, and then commence with mass generation.
two. Mass Creation After First Article Inspection
one).After the 1st write-up approved by operator and workshop foreman, and then start off with mass manufacturing.
two). During mass generation, the operator wants to inspect the threads every ten parts, and measure the dimensions every 15 items. After any fittings of threads and proportions out of the specs, all this batch of fittings will be inspected totally.
3). The competent fittings will be fitly place in a plastic box piece by piece.
four). Finally, the finished fittings will be transported to inspection department for last inspection.
3. Last Inspection
1). Physical appearance: 100% inspection unEPTTstrong gentle. No scratch, No burr.
two). Essential dimensions and angles: 15-twenty% randomly inspection by callipers and contracer. As soon as any measurements and angles of fittings out of specs or doesn’t regard to drawings, this batch of fittings will be pressured to return back again to production workshop to enhance or make a new substitute.
three).Threads: fifteen-twenty% randomly inspection by rigEPTT gages. Once any threads out of specs or doesn’t regard to drawings, this batch of fittings will be forced to return again to production workshop to enhance or make a new substitution.
six. After Provider:
When clientele have any grievances about our goods, we will just take a fast action.
We can a hundred% make a new replacement for cost-free when the customer has a grievance about our merchandise.
Our EPTT
FAQ
Q: Are you a buying and selling company or company?
A: We are a a hundred% producer, main products include stainless steel EPT hose fittings and stainless steel EPT adapters.
Q: Do you have stock?
A: At the moment we created to purchase, but we do have some shares for typical sort raw materials. So we can make a swift action for some urgent orders.
Q: Do you have a MOQ ask for?
A: Generally our MOQ is 200 parts. But for some larger sizes, fifty or 100 pieces is also satisfactory for the first order.
Q: How about your payment approach?
A: 30% deposit in EPT, the harmony payment from the duplicate of Invoice of lading. Of course, I believe everything is negotiable.
Q: What about your supply time?
A: About 45 daEPTTfor common orders. But it is dependent on the orEPTTvolume. Of course, if you have an urgent buy, we will try out very best to satisfy you.