DUMP TRAILER Power UNIT-DOUBLE ACTING
Standard Description
This electrical power unit includes a energy up electrical power down circuit with load holding on each A & B ports. A stress compensatred movement control might be additional to circuit to manage the decent pace with the cylinder.
Specific Notes
1. This energy unit is of S3 duty cycle, i.e., non-continuous operation, 30 seconds on and 270 seconds off.
2. Clean every one of the hydraulic elements concerned in advance of set up of the energy unit.
three. Viscosity of the hydraulic oil shoud be 15~46 cst, which really should also be clean and absolutely free of impurities. N46 hydraulic oil is advised.
4. The power unit ought to be mounted horizontally.
5. Check the oil degree inside the tank just after the preliminary working of your electrical power unit.
six. Oil modifying is needed just after the preliminary 100 operation hours, afterwards as soon as each 3000 hours.
DUMP TRAILER Electrical power UNIT- SINGLE ACTING
Standard Description
This power unit has a energy up gravity down circuit. Get started the motor to lengthen the cylinder and activate the solenoid valve to retract the circuit. Manual override to solenoid valve could be provided if required. Also a stress compen sated movement manage can be extra to your circuit to manage the descent speed with the cylinder.
Remark: Please check with our income engineer for your distinctive pump displacement, motor energy or tank capability.
Distinctive Notes
1. This electrical power unit is of S3 duty cycle, i.e., non-continuous operation, 30 seconds on and 270 seconds off.
two. Clean each of the hydraulic components concerned before set up of the power unit.
3. Viscosity of your hydraulic oil shoud be 15~46 cst,which ought to also be clean and free of charge of impurities.N46 hydraulic oil is recommended.
4. The electrical power unit must be mounted horizontally.
5. Check the oil level from the tank after the first working with the electrical power unit.
6. Oil changing is required just after the preliminary 100 operation hrs, afterwards once each and every 3000 hrs.